Ravenswood Pump Station
Ravensthorpe Water Treatment Facility ventilation design was based on radiant heat load emitted from the water pump engines within the pumping station enclosures.
Arcadia provided a ventilation design solution with calculations and recommendations that were extensively challenged and confirmed by the Water Authority's lead mechanical engineers. This included Strand® outlet roof ventilators and Spur® inlet wall louvres to provide a cost effective, low maintenance, natural ventilation solution.